River Road and Lake Road Roundabout
Project objective
Intersection transformation as part of R2Z programme and support increased turning traffic movements accessing SH1 (State Highway 1)An urban fringe scale roundabout is proposed, identical in geometry to the River road/Horotiu bridge road roundabout.
Preliminary design to establish land requirements and key design considerations including impacts on services and to determine if additional works are required on the River Rd approaches from Lake Rd as there is a significant sag in the road that affects approach visibility to be complete 2022/23
Detail Design and construction 2023/24
Project update
25/07/2024 - All kerb and channel, including central rotary apron, has now been constructed. All islands to be concrete infilled within the next week, followed by the final pavement construction and surfacing. Surfacing is likely to be undertaken during a nighttime road closure from 05/08/2024.At a glance
Status
Completed
Categories
Roading
General wards
Newcastle-Ngāruawāhia General Ward
Maaori wards
Tai Runga Takiwaa Maaori Ward
Towns
Taupiri-Lake Kainui
Completion date
September 2024